Case Study #1
Missing Trash Tank
Background
Before a manufacturer of an aerobic wastewater treatment system can sell a particular model in Texas, it is sent to a testing facility for a rigorous six month operational test.
These six month long tests cost a manufacturer $250,000 for each different model tested. After receiving the TCEQ seal of approval, that system must be installed as tested by the facility. For obvious reasons, there can be no changes to the installation procedures and equipment.
This case study is about a TCEQ-approved two-tank aerobic wastewater treatment system (trash/pre-treatment + ATU) installed without the trash/pretreatment tank (ATU only).
Situation
Twenty years ago, the environmental health department of a county on the gulf coast arbitrarily changed the design parameters of a TCEQ approved waste water system. Years later, Advanced Aerobic Systems became the maintenance provider for new clients who all had the same complaint: during heavy rain/storm events, or high tides (neap tides) their aerobic wastewater system would back up into their elevated beach homes.
Observations
These county-permitted wastewater systems were installed without the TCEQ-mandated trash tank. Sewer effluent from the elevated home flowed directly into the treatment compartment. There was no pre-treatment (settling out of solids) as you would normally have with a trash tank.
The solids are now circulating in the treatment compartment. Compounding the problem, the tank design has an opening directly over the common wall that separates the treatment and clarifier compartments.
When the disposal field became water logged during a heavy rain event or high tide, everything backed up into the home. The elevated water level in the tank allowed the solids from the treatment tank to flow over the common wall into the clarifier. As the water table lowered, solids from the clarifier would then flow into the 8" gravel less pipe in the disposal field. Eventually the disposal field will fill with solids.
Solution
Always install according to tested specs. A separate trash tank needs to be added to these systems. Don't cut corners!